OUR PREVIOUS LOGISTIC SERVICES

  • home
  • Our Previous Logistic Services

1- Transportation Services

Job #1

  • Project Name

    : Natural Gas Compressor Station (Siba Gas Field)
  • Our Client

    : PETROJET (For Kuwait Energy)

Items:

1. Different project materials from Um Qasir Port to the site

2. Containers from Basrah city to the site

3. Project material from stores to different areas in the site

4. Steel structure from Rumaila to Siba site

5. Bullet tank from PETROJET workshops to Siba site

6. 700 Ton and 400 Ton Cranes from North Iraqi Border (Ibrahim Alkhalil - Zakho) to the site

Job #2

  • Project Name

    : Hammer Mushrif De-Gassing Station
  • Our Client

    : PETROJET (For SAMSUNG)

Items:

Transportation services for the following items:

1. Containers from Basrah City to the site

2. Scaffolding material from Baghdad City to the site

3. 8 No. Cranes belong to PETROJET from Rumaila to the site

4. Project material from stores to different areas in the site

5. Flare parts from the port to the site

6. Flare parts from SAMSUNG stores to the site

Job #3

  • Project Name

    : Zubair Permanent Power Generation Plant (PPG)
  • Our Client

    : Shams Alsabah (For GE)

Items:

Transportation services for the following items:

1. Company staff and workers from Basrah City (or Basrah International Airport) to the site

2. Project material within the site area

3. Scaffolding materials from Irbil City and Baghdad City to the site

4. Containers from Baghdad to Basrah (site area)

5. Project materials from the port to the site

Job #4

  • Project Name

    : Zubair Permanent Power Generation Plant (PPG)
  • Our Client

    : Power World Engineering (For GE)

Items:

Transportation services for the following items:

1. Caravans of PWE to the site with the installation

2. Containers (124 No.) to the site

3. Scaffolding material from Baghdad to the site

4. 500 ton Crane from Irbil to the site

5. Construction materials within the site area

Job #5

  • Project Name

    : ZHammar Degassing Station (PPG)
  • Our Client

    : Albilal Co. (For BGC)

Items:

Transportation services for the following items:

1. Scaffolding material from Baghdad to the site

2. Transformers and parts of the flare from Safwan to the site

3. Caravans belong to Albilal camp with the installation

4. Isolators of the station from Safwan (Iraqi borders) to the site

Job #6

  • Project Name

    : Halfaya Oil Field
  • Our Client

    : Bohai (For PetroChina)

Items:

Transportation services for the following items:

1. Drilling Rig No. 111 for 27 km within the site area

2. Drilling Rig No. 30 for 30 km within the site area

3. Drilling Rig No. 112 for 12 km within the site area

4. Drilling Rig No. 100 for 43 km within the site area

5. Drilling Rig No. 99 for 36 km within the site area

2. Renting Equipment

 

- Renting pickup trucks and trailer trucks for Bohai Drilling Engineering (2017).

- Renting heavy constructional and lifting equipment for Elegant Engineering Company in Um Qasir Port Project (2022-2019).

- Renting equipment such as Manlift, Cranes, Trailers (flat type) to Shams Al-Sabah (SAS) in Zubair Permanent Power Generation Plant (PPG) (2018).

- Supplying Cranes and Flat Loader Trucks for NTS Energy in Safwan-Basrah (2016).-

3. Lifting Works

 

- Installation of steel structures, tanks and pipes for SAS and PEW companies in Zubair Permanent Power Generation Plant (PPG)

- Installation of steel structures and LPG Bullet Tanks in for PETROJET in Natural Gas Compressor Station (Siba Gas Field) (2018-2016).

4. Provide All Types of Manpower

 

- Supplying manpower (for two years), for PETROJET in Natural Gas Compressor Station (Siba Gas Field) (2018-2016).

- Supplying manpower and formwork materials as well as renting equipment Shams Al-Sabah (SAS) in Zubair Permanent Power Generation Plant (PPG) (2018).

5. Supply All Types of Construction Materials

 

- Supplying painting material, reinforcement bars, scaffolding material furniture for offices, electrical devices, and formwork materials for Power World Engineering (PWE) in Zubair Permanent Power Generation Plant (PPG) (2021-2018).

- Supplying T-wall to GE company in Zubair Permanent Power Generation Plant (PPG) (2020).

- Supplying formwork materials and concrete for Shams Al-Sabah (SAS) in Zubair Permanent Power Generation Plant (PPG) (2018).

6. Supply Caravan and All Site Camp Needs

 

- Supplying site camp supplies for Maraba`a Aliraq Alkhadhra`a Company in West Qurna Field/2 (2015).

- Supplying site camp supplies for Bohai Drilling Engineering (2017).

- Supplying fully furnished mobilized caravans (8 No.) for Kuwait Energy in Majnoun Oil Field- Block/9 (2020).

7. Supply All Types of Fuel

 

- Supplying fuel to GE company in Zubair Permanent Power Generation Plant (PPG) (2020).

8. Supply Industrial Gases

 

- Supplying industrial gases for Power World Engineering (PWE) in Zubair Permanent Power Generation Plant (PPG) (2021-2018).

- Supplying industrial gases for PETROJET in Hammar Degassing Station (2017) as follows

A. Argon gas cylinders (2500 No.)

B. Estelline gas cylinders (500 No.)

C. Nitrogen gas cylinders (150 No.)

D. Oxygen gas cylinders (4000 No.)

9. Equipment, Tools, Generators, And Machineries.

 

- Supplying batteries with different capacities (70 ,90 ,120 ah) to Almasar Co. (2015).

- Supplying different types of equipment for MSK company in Zubair Oil Field (2020).

- Supplying Diesel Generators 500 kv and office furniture for VEOLIA in Shuaiba refinery (2018).